{"product_id":"biothane®-3-5-metre-long-lead-with-handle","title":"BioThane® 3.5 Metre Long Lead with Handle","description":"\u003cp\u003e\u003cspan\u003eThis waterproof and rust proof long line\u003c\/span\u003e\u003cspan\u003e lead with handle is 3.5 metres in length with a solid brass trigger clip, handle with d-ring and solid brass screws.\u003c\/span\u003e\u003c\/p\u003e\n\u003cp\u003e\u003cspan\u003eIt is made with 12mm wide BioThane® and our smallest trigger clip meaning they are as light weight as we can make them so your dog will hardly feel it is there.\u003c\/span\u003e\u003c\/p\u003e\n\u003cp\u003e\u003cspan\u003e\u003cmeta charset=\"utf-8\"\u003eThese long leads will withstand being dragged through endless muddy wet terrain and can be wiped clean and quickly dried afterwards. \u003c\/span\u003e\u003c\/p\u003e\n\u003cp\u003e\u003cspan\u003eWe also sell a 7.5 metre and a 15 metre longline lead with handle but if you require a shorter or wider lead then we can easily accommodate this, just send us an email with your requirements.\u003c\/span\u003e\u003c\/p\u003e\n\u003cp\u003eOur mission was to design a range of practical, simple but stylish waterproof collars and leads with swimming and outdoor dog adventures in mind.\u003cbr\u003e\u003c\/p\u003e\n\u003cp\u003e\u003cmeta charset=\"utf-8\"\u003e\u003cspan class=\"fbPhotoCaptionText\" data-mce-fragment=\"1\"\u003eOur handmade collars and leads are made of\u003cspan data-mce-fragment=\"1\"\u003e \u003c\/span\u003e\u003c\/span\u003e\u003cspan data-mce-fragment=\"1\"\u003eBioThane®, a very strong rubber coated webbing that has a soft pliable leather like look and feel. \u003c\/span\u003e \u003cmeta charset=\"utf-8\"\u003eBioThane® is water resistant, mould resistant, odour resistant, anti-bacterial and easy to keep clean. \u003cmeta charset=\"utf-8\"\u003eThe ideal material for any active pup, especially if your dog likes a swim or gets very dirty during their walks, simply wipe it clean afterwards and it will be as good as new.\u003c\/p\u003e\n\u003cp\u003eBioThane® has proven durability in applications where safety, clean-ability, flexibility and strength are critical. It is a trusted brand in a variety of sports, such as equestrianism, as well as in the military and international space organisations. \u003cbr\u003e\u003cmeta charset=\"utf-8\"\u003e\u003c\/p\u003e\n\u003cp class=\"font_8 wixui-rich-text__text\"\u003e\u003cspan class=\"wixui-rich-text__text\"\u003e\u003cspan class=\"text_exposed_show\"\u003eBioThane® is the brand name of the highest quality waterproof webbing that is currently available on the market. Genuine BioThane® waterproof webbing is of a higher quality, much smoother to touch, flexuous and more durable with a longer lifeline than other cheaper waterproof webbings on the market.\u003c\/span\u003e\u003c\/span\u003e\u003cspan class=\"wixui-rich-text__text\"\u003e\u003cspan class=\"text_exposed_show\"\u003e\u003cbr data-mce-fragment=\"1\"\u003e\u003c\/span\u003e\u003c\/span\u003e\u003c\/p\u003e\n\u003cp class=\"font_8 wixui-rich-text__text\"\u003e\u003cspan class=\"wixui-rich-text__text\"\u003e\u003cspan class=\"text_exposed_show\"\u003eThe material is very durable and strong with an average breaking load strength of around 340kg. \u003c\/span\u003e\u003c\/span\u003e\u003c\/p\u003e\n\u003cdiv id=\"comp-lhgcz300\" class=\"KcpHeO tz5f0K comp-lhgcz300 wixui-rich-text\" data-testid=\"richTextElement\"\u003e\n\u003ch5 class=\"font_5 wixui-rich-text__text\"\u003e\n\u003cspan class=\"wixui-rich-text__text\"\u003e\u003c\/span\u003e\u003cbr\u003e\n\u003c\/h5\u003e\n\u003cbr\u003e\n\u003c\/div\u003e\n\u003cdiv id=\"comp-l3ilc2v0\" class=\"KcpHeO tz5f0K comp-l3ilc2v0 wixui-rich-text\" data-testid=\"richTextElement\"\u003e\u003c\/div\u003e","brand":"Franks Goods","offers":[{"title":"Lavender","offer_id":53807286845777,"sku":null,"price":45.0,"currency_code":"GBP","in_stock":true},{"title":"Sage","offer_id":53807286878545,"sku":null,"price":45.0,"currency_code":"GBP","in_stock":true},{"title":"Cobalt Blue","offer_id":53807286911313,"sku":null,"price":45.0,"currency_code":"GBP","in_stock":true},{"title":"Orange","offer_id":53807286944081,"sku":null,"price":45.0,"currency_code":"GBP","in_stock":true},{"title":"Black","offer_id":53807286976849,"sku":null,"price":45.0,"currency_code":"GBP","in_stock":true},{"title":"Khaki","offer_id":53807287009617,"sku":null,"price":45.0,"currency_code":"GBP","in_stock":true},{"title":"Grey","offer_id":53807287042385,"sku":null,"price":45.0,"currency_code":"GBP","in_stock":true},{"title":"Olive","offer_id":53807287075153,"sku":null,"price":45.0,"currency_code":"GBP","in_stock":true},{"title":"Wine","offer_id":53807287107921,"sku":null,"price":45.0,"currency_code":"GBP","in_stock":true},{"title":"Gold","offer_id":53807287140689,"sku":null,"price":45.0,"currency_code":"GBP","in_stock":true},{"title":"Emerald","offer_id":53807287173457,"sku":null,"price":45.0,"currency_code":"GBP","in_stock":true},{"title":"Dark Brown","offer_id":53807287206225,"sku":null,"price":45.0,"currency_code":"GBP","in_stock":true},{"title":"Neon Pink","offer_id":53807287238993,"sku":null,"price":45.0,"currency_code":"GBP","in_stock":true},{"title":"Sky Blue","offer_id":53807287271761,"sku":null,"price":45.0,"currency_code":"GBP","in_stock":true},{"title":"Guacamole","offer_id":53807287304529,"sku":null,"price":45.0,"currency_code":"GBP","in_stock":true},{"title":"Lime","offer_id":53807287337297,"sku":null,"price":45.0,"currency_code":"GBP","in_stock":true},{"title":"Coral","offer_id":53807287370065,"sku":null,"price":45.0,"currency_code":"GBP","in_stock":true},{"title":"Bubblegum","offer_id":53807287402833,"sku":null,"price":45.0,"currency_code":"GBP","in_stock":true},{"title":"Neon Yellow","offer_id":53807287435601,"sku":null,"price":45.0,"currency_code":"GBP","in_stock":true},{"title":"Bluebell","offer_id":53807287468369,"sku":null,"price":45.0,"currency_code":"GBP","in_stock":true},{"title":"Sunflower","offer_id":53807287501137,"sku":null,"price":45.0,"currency_code":"GBP","in_stock":true},{"title":"Red","offer_id":53807287533905,"sku":null,"price":45.0,"currency_code":"GBP","in_stock":true},{"title":"Primary Blue","offer_id":53807287566673,"sku":null,"price":45.0,"currency_code":"GBP","in_stock":true},{"title":"Mint","offer_id":53807287599441,"sku":null,"price":45.0,"currency_code":"GBP","in_stock":true},{"title":"Latte","offer_id":53807287632209,"sku":null,"price":45.0,"currency_code":"GBP","in_stock":true},{"title":"Powder Blue","offer_id":53807287664977,"sku":null,"price":45.0,"currency_code":"GBP","in_stock":true},{"title":"Pastel Pink","offer_id":53807287697745,"sku":null,"price":45.0,"currency_code":"GBP","in_stock":true},{"title":"Silver","offer_id":53807287730513,"sku":null,"price":45.0,"currency_code":"GBP","in_stock":true},{"title":"Lemonade","offer_id":53807287763281,"sku":null,"price":45.0,"currency_code":"GBP","in_stock":true},{"title":"Tan","offer_id":53807287796049,"sku":null,"price":45.0,"currency_code":"GBP","in_stock":true},{"title":"Aubergine","offer_id":53807287828817,"sku":null,"price":45.0,"currency_code":"GBP","in_stock":true},{"title":"Mushroom","offer_id":53807287861585,"sku":null,"price":45.0,"currency_code":"GBP","in_stock":true}],"thumbnail_url":"\/\/cdn.shopify.com\/s\/files\/1\/0791\/3455\/6497\/files\/IMG_0319.jpg?v=1779122999","url":"https:\/\/franksgoods.com\/products\/biothane%c2%ae-3-5-metre-long-lead-with-handle","provider":"Franks Goods","version":"1.0","type":"link"}