{"product_id":"biothane®-20-metre-long-lead-with-handle","title":"BioThane® 20 Metre Long Lead with Handle","description":"\u003cp\u003e\u003cspan\u003eThis waterproof and rust proof long line\u003c\/span\u003e\u003cspan\u003e lead with handle is 20 metres in length with a solid brass trigger clip, handle with d-ring and solid brass screws.\u003c\/span\u003e\u003c\/p\u003e\n\u003cp\u003e\u003cspan\u003eIt is made with 12mm wide BioThane® and our smallest trigger clip meaning they are as light weight as we can make them so your dog will hardly feel it is there.\u003c\/span\u003e\u003c\/p\u003e\n\u003cp\u003e\u003cspan\u003eThese long leads will withstand being dragged through endless muddy wet terrain and can be wiped clean and quickly dried afterwards. \u003c\/span\u003e\u003c\/p\u003e\n\u003cp\u003e\u003cspan\u003eWe also sell shorter 3.5 metre, 7.5 metre and 15 metre longlines with a handle but if you require a shorter, longer or wider lead than these we can easily accommodate this, just send us an email with your requirements.\u003c\/span\u003e\u003c\/p\u003e\n\u003cp\u003eOur mission was to design a range of practical, simple but stylish waterproof collars and leads with swimming and outdoor dog adventures in mind.\u003c\/p\u003e\n\u003cp\u003e\u003cspan class=\"fbPhotoCaptionText\" data-mce-fragment=\"1\"\u003eOur handmade collars and leads are made of\u003cspan data-mce-fragment=\"1\"\u003e \u003c\/span\u003e\u003c\/span\u003e\u003cspan data-mce-fragment=\"1\"\u003eBioThane®, a very strong rubber coated webbing that has a soft pliable leather like look and feel. \u003c\/span\u003e \u003c\/p\u003e\n\u003cp\u003eBioThane® is water resistant, mould resistant, odour resistant, anti-bacterial and easy to keep clean. \u003c\/p\u003e\n\u003cp\u003eThe ideal material for any active pup, especially if your dog likes a swim or gets very dirty during their walks, simply wipe it clean afterwards and it will be as good as new.\u003c\/p\u003e\n\u003cp\u003eBioThane® has proven durability in applications where safety, clean-ability, flexibility and strength are critical. It is a trusted brand in a variety of sports, such as equestrianism, as well as in the military and international space organisations. \u003c\/p\u003e\n\u003cp class=\"font_8 wixui-rich-text__text\"\u003e\u003cspan class=\"wixui-rich-text__text\"\u003e\u003cspan class=\"text_exposed_show\"\u003eBioThane® is the brand name of the highest quality waterproof webbing that is currently available on the market. Genuine BioThane® waterproof webbing is of a higher quality, much smoother to touch, flexuous and more durable with a longer lifeline than other cheaper waterproof webbings on the market.\u003c\/span\u003e\u003c\/span\u003e\u003cspan class=\"wixui-rich-text__text\"\u003e\u003cspan class=\"text_exposed_show\"\u003e\u003cbr data-mce-fragment=\"1\"\u003e\u003c\/span\u003e\u003c\/span\u003e\u003c\/p\u003e\n\u003cp class=\"font_8 wixui-rich-text__text\"\u003e\u003cspan class=\"wixui-rich-text__text\"\u003e\u003cspan class=\"text_exposed_show\"\u003eThe material is very durable and strong with an average breaking load strength of around 340kg. \u003c\/span\u003e\u003c\/span\u003e\u003c\/p\u003e\n\u003cdiv id=\"comp-lhgcz300\" class=\"KcpHeO tz5f0K comp-lhgcz300 wixui-rich-text\" data-testid=\"richTextElement\"\u003e\n\u003cspan class=\"wixui-rich-text__text\"\u003e\u003c\/span\u003e\u003cbr\u003e\n\u003c\/div\u003e\n\u003cdiv id=\"comp-l3ilc2v0\" class=\"KcpHeO tz5f0K comp-l3ilc2v0 wixui-rich-text\" data-testid=\"richTextElement\"\u003e\u003c\/div\u003e","brand":"Franks Goods","offers":[{"title":"Lavender","offer_id":54379020812625,"sku":null,"price":80.0,"currency_code":"GBP","in_stock":true},{"title":"Sage","offer_id":54379020845393,"sku":null,"price":80.0,"currency_code":"GBP","in_stock":true},{"title":"Cobalt Blue","offer_id":54379020878161,"sku":null,"price":80.0,"currency_code":"GBP","in_stock":true},{"title":"Orange","offer_id":54379020910929,"sku":null,"price":80.0,"currency_code":"GBP","in_stock":true},{"title":"Black","offer_id":54379020943697,"sku":null,"price":80.0,"currency_code":"GBP","in_stock":true},{"title":"Khaki","offer_id":54379020976465,"sku":null,"price":80.0,"currency_code":"GBP","in_stock":true},{"title":"Grey","offer_id":54379021009233,"sku":null,"price":80.0,"currency_code":"GBP","in_stock":true},{"title":"Olive","offer_id":54379021042001,"sku":null,"price":80.0,"currency_code":"GBP","in_stock":true},{"title":"Wine","offer_id":54379021074769,"sku":null,"price":80.0,"currency_code":"GBP","in_stock":true},{"title":"Gold","offer_id":54379021107537,"sku":null,"price":80.0,"currency_code":"GBP","in_stock":true},{"title":"Emerald","offer_id":54379021140305,"sku":null,"price":80.0,"currency_code":"GBP","in_stock":true},{"title":"Dark Brown","offer_id":54379021173073,"sku":null,"price":80.0,"currency_code":"GBP","in_stock":true},{"title":"Neon Pink","offer_id":54379021205841,"sku":null,"price":80.0,"currency_code":"GBP","in_stock":true},{"title":"Sky Blue","offer_id":54379021238609,"sku":null,"price":80.0,"currency_code":"GBP","in_stock":true},{"title":"Guacamole","offer_id":54379021271377,"sku":null,"price":80.0,"currency_code":"GBP","in_stock":true},{"title":"Lime","offer_id":54379021304145,"sku":null,"price":80.0,"currency_code":"GBP","in_stock":true},{"title":"Coral","offer_id":54379021336913,"sku":null,"price":80.0,"currency_code":"GBP","in_stock":true},{"title":"Bubblegum","offer_id":54379021369681,"sku":null,"price":80.0,"currency_code":"GBP","in_stock":true},{"title":"Neon Yellow","offer_id":54379021402449,"sku":null,"price":80.0,"currency_code":"GBP","in_stock":true},{"title":"Bluebell","offer_id":54379021435217,"sku":null,"price":80.0,"currency_code":"GBP","in_stock":true},{"title":"Sunflower","offer_id":54379021467985,"sku":null,"price":80.0,"currency_code":"GBP","in_stock":true},{"title":"Red","offer_id":54379021500753,"sku":null,"price":80.0,"currency_code":"GBP","in_stock":true},{"title":"Primary Blue","offer_id":54379021533521,"sku":null,"price":80.0,"currency_code":"GBP","in_stock":true},{"title":"Mint","offer_id":54379021566289,"sku":null,"price":80.0,"currency_code":"GBP","in_stock":true},{"title":"Latte","offer_id":54379021599057,"sku":null,"price":80.0,"currency_code":"GBP","in_stock":true},{"title":"Powder Blue","offer_id":54379021631825,"sku":null,"price":80.0,"currency_code":"GBP","in_stock":true},{"title":"Pastel Pink","offer_id":54379021664593,"sku":null,"price":80.0,"currency_code":"GBP","in_stock":true},{"title":"Silver","offer_id":54379021697361,"sku":null,"price":80.0,"currency_code":"GBP","in_stock":true},{"title":"Lemonade","offer_id":54379021730129,"sku":null,"price":80.0,"currency_code":"GBP","in_stock":true},{"title":"Tan","offer_id":54379021762897,"sku":null,"price":80.0,"currency_code":"GBP","in_stock":true},{"title":"Aubergine","offer_id":54379021795665,"sku":null,"price":80.0,"currency_code":"GBP","in_stock":true},{"title":"Mushroom","offer_id":54379021828433,"sku":null,"price":80.0,"currency_code":"GBP","in_stock":true}],"thumbnail_url":"\/\/cdn.shopify.com\/s\/files\/1\/0791\/3455\/6497\/files\/IMG_2172.jpg?v=1784630586","url":"https:\/\/franksgoods.com\/products\/biothane%c2%ae-20-metre-long-lead-with-handle","provider":"Franks Goods","version":"1.0","type":"link"}