{"product_id":"biothane®-10-metre-long-lead-with-handle","title":"BioThane® 10 Metre Long Line Lead with Handle","description":"\u003cp\u003e\u003cspan\u003eThis waterproof and rust proof long line\u003c\/span\u003e\u003cspan\u003e lead with handle is 10 metres in length with a solid brass trigger clip, handle with d-ring and solid brass screws.\u003c\/span\u003e\u003c\/p\u003e\n\u003cp\u003e\u003cspan\u003eIt is made with 12mm wide BioThane® and our smallest trigger clip meaning they are as light weight as we can make them so your dog will hardly feel it is there.\u003c\/span\u003e\u003c\/p\u003e\n\u003cp\u003e\u003cspan\u003eThese long leads will withstand being dragged through endless muddy wet terrain and can be wiped clean and quickly dried afterwards. \u003c\/span\u003e\u003c\/p\u003e\n\u003cp\u003e\u003cspan\u003eWe also sell shorter 3.5 metre and 7.5 metre longlines plus a longer 15 metre with a handle but if you require a shorter, longer or wider lead than these we can easily accommodate this, just send us an email with your requirements.\u003c\/span\u003e\u003c\/p\u003e\n\u003cp\u003eOur mission was to design a range of practical, simple but stylish waterproof collars and leads with swimming and outdoor dog adventures in mind.\u003c\/p\u003e\n\u003cp\u003e\u003cspan class=\"fbPhotoCaptionText\"\u003eOur handmade collars and leads are made of\u003cspan\u003e \u003c\/span\u003e\u003c\/span\u003e\u003cspan\u003eBioThane®, a very strong rubber coated webbing that has a soft pliable leather like look and feel. \u003c\/span\u003e \u003c\/p\u003e\n\u003cp\u003eBioThane® is water resistant, mould resistant, odour resistant, anti-bacterial and easy to keep clean. \u003c\/p\u003e\n\u003cp\u003eThe ideal material for any active pup, especially if your dog likes a swim or gets very dirty during their walks, simply wipe it clean afterwards and it will be as good as new.\u003c\/p\u003e\n\u003cp\u003eBioThane® has proven durability in applications where safety, clean-ability, flexibility and strength are critical. It is a trusted brand in a variety of sports, such as equestrianism, as well as in the military and international space organisations. \u003c\/p\u003e\n\u003cp class=\"font_8 wixui-rich-text__text\"\u003e\u003cspan class=\"wixui-rich-text__text\"\u003e\u003cspan class=\"text_exposed_show\"\u003eBioThane® is the brand name of the highest quality waterproof webbing that is currently available on the market. Genuine BioThane® waterproof webbing is of a higher quality, much smoother to touch, flexuous and more durable with a longer lifeline than other cheaper waterproof webbings on the market.\u003c\/span\u003e\u003c\/span\u003e\u003cspan class=\"wixui-rich-text__text\"\u003e\u003cspan class=\"text_exposed_show\"\u003e\u003cbr\u003e\u003c\/span\u003e\u003c\/span\u003e\u003c\/p\u003e\n\u003cp class=\"font_8 wixui-rich-text__text\"\u003e\u003cspan class=\"wixui-rich-text__text\"\u003e\u003cspan class=\"text_exposed_show\"\u003eThe material is very durable and strong with an average breaking load strength of around 340kg. \u003c\/span\u003e\u003c\/span\u003e\u003c\/p\u003e\n\u003cdiv id=\"comp-lhgcz300\" class=\"KcpHeO tz5f0K comp-lhgcz300 wixui-rich-text\"\u003e\n\u003cspan class=\"wixui-rich-text__text\"\u003e\u003c\/span\u003e\u003cbr\u003e\n\u003c\/div\u003e\n\u003cdiv id=\"comp-l3ilc2v0\" class=\"KcpHeO tz5f0K comp-l3ilc2v0 wixui-rich-text\"\u003e\u003c\/div\u003e","brand":"Franks Goods","offers":[{"title":"Lavender","offer_id":54878228087121,"sku":null,"price":70.0,"currency_code":"GBP","in_stock":true},{"title":"Sage","offer_id":54878228119889,"sku":null,"price":70.0,"currency_code":"GBP","in_stock":true},{"title":"Cobalt Blue","offer_id":54878228152657,"sku":null,"price":70.0,"currency_code":"GBP","in_stock":true},{"title":"Orange","offer_id":54878228185425,"sku":null,"price":70.0,"currency_code":"GBP","in_stock":true},{"title":"Black","offer_id":54878228218193,"sku":null,"price":70.0,"currency_code":"GBP","in_stock":true},{"title":"Khaki","offer_id":54878228250961,"sku":null,"price":70.0,"currency_code":"GBP","in_stock":true},{"title":"Grey","offer_id":54878228283729,"sku":null,"price":70.0,"currency_code":"GBP","in_stock":true},{"title":"Olive","offer_id":54878228316497,"sku":null,"price":70.0,"currency_code":"GBP","in_stock":true},{"title":"Wine","offer_id":54878228349265,"sku":null,"price":70.0,"currency_code":"GBP","in_stock":true},{"title":"Gold","offer_id":54878228382033,"sku":null,"price":70.0,"currency_code":"GBP","in_stock":true},{"title":"Emerald","offer_id":54878228414801,"sku":null,"price":70.0,"currency_code":"GBP","in_stock":true},{"title":"Dark Brown","offer_id":54878228447569,"sku":null,"price":70.0,"currency_code":"GBP","in_stock":true},{"title":"Neon Pink","offer_id":54878228480337,"sku":null,"price":70.0,"currency_code":"GBP","in_stock":true},{"title":"Sky Blue","offer_id":54878228513105,"sku":null,"price":70.0,"currency_code":"GBP","in_stock":true},{"title":"Guacamole","offer_id":54878228545873,"sku":null,"price":70.0,"currency_code":"GBP","in_stock":true},{"title":"Lime","offer_id":54878228578641,"sku":null,"price":70.0,"currency_code":"GBP","in_stock":true},{"title":"Coral","offer_id":54878228611409,"sku":null,"price":70.0,"currency_code":"GBP","in_stock":true},{"title":"Bubblegum","offer_id":54878228644177,"sku":null,"price":70.0,"currency_code":"GBP","in_stock":true},{"title":"Neon Yellow","offer_id":54878228676945,"sku":null,"price":70.0,"currency_code":"GBP","in_stock":true},{"title":"Bluebell","offer_id":54878228709713,"sku":null,"price":70.0,"currency_code":"GBP","in_stock":true},{"title":"Sunflower","offer_id":54878228742481,"sku":null,"price":70.0,"currency_code":"GBP","in_stock":true},{"title":"Red","offer_id":54878228775249,"sku":null,"price":70.0,"currency_code":"GBP","in_stock":true},{"title":"Primary Blue","offer_id":54878228808017,"sku":null,"price":70.0,"currency_code":"GBP","in_stock":true},{"title":"Mint","offer_id":54878228840785,"sku":null,"price":70.0,"currency_code":"GBP","in_stock":true},{"title":"Latte","offer_id":54878228873553,"sku":null,"price":70.0,"currency_code":"GBP","in_stock":true},{"title":"Powder Blue","offer_id":54878228906321,"sku":null,"price":70.0,"currency_code":"GBP","in_stock":true},{"title":"Pastel Pink","offer_id":54878228939089,"sku":null,"price":70.0,"currency_code":"GBP","in_stock":true},{"title":"Silver","offer_id":54878228971857,"sku":null,"price":70.0,"currency_code":"GBP","in_stock":true},{"title":"Lemonade","offer_id":54878229004625,"sku":null,"price":70.0,"currency_code":"GBP","in_stock":true},{"title":"Tan","offer_id":54878229037393,"sku":null,"price":70.0,"currency_code":"GBP","in_stock":true},{"title":"Aubergine","offer_id":54878229070161,"sku":null,"price":70.0,"currency_code":"GBP","in_stock":true},{"title":"Mushroom","offer_id":54878229102929,"sku":null,"price":70.0,"currency_code":"GBP","in_stock":true},{"title":"Peach","offer_id":54878235066705,"sku":null,"price":70.0,"currency_code":"GBP","in_stock":true},{"title":"Turquoise","offer_id":54878237163857,"sku":null,"price":70.0,"currency_code":"GBP","in_stock":true}],"thumbnail_url":"\/\/cdn.shopify.com\/s\/files\/1\/0791\/3455\/6497\/files\/IMG_3786.jpg?v=1789205264","url":"https:\/\/franksgoods.com\/products\/biothane%c2%ae-10-metre-long-lead-with-handle","provider":"Franks Goods","version":"1.0","type":"link"}